| snippet:
|
Official record of planned road-way maintenance projects performed by the City Of San Marcos Public Services Department on an annual (fiscal year) basis. The feature class includes all CoSM owned or maintained centerline segments, regardless of whether or not they are planned for maintenance. The [WorkStatus] field will have values to differentiate between planed and unplanned road-ways. Any completed projects at the end of a fiscal year will be moved to a related table where all completed projects will be recorded. The primary purpose of this feature class is to visualize projects across the City, and to quickly query for approximate road sizes and maintenance cost estimates, to better inform management. |
| summary:
|
Official record of planned road-way maintenance projects performed by the City Of San Marcos Public Services Department on an annual (fiscal year) basis. The feature class includes all CoSM owned or maintained centerline segments, regardless of whether or not they are planned for maintenance. The [WorkStatus] field will have values to differentiate between planed and unplanned road-ways. Any completed projects at the end of a fiscal year will be moved to a related table where all completed projects will be recorded. The primary purpose of this feature class is to visualize projects across the City, and to quickly query for approximate road sizes and maintenance cost estimates, to better inform management. |
| accessInformation:
|
Public Services Transportation Division GIS, City of San Marcos |
| thumbnail:
|
|
| maxScale:
|
5000 |
| typeKeywords:
|
[] |
| description:
|
<DIV STYLE="text-align:Left;"><DIV><DIV><P><SPAN>[StName] The full street name of the centerline segment being modeled. </SPAN></P><P><SPAN>[St_From] Cross street representing the start or end of the centerline segment referenced in the [StName] field. Unlike in geocoding, this does not necessarily mean the start or end, in terms of digitized geometry directions. This field simply defines the boundaries of the segment. </SPAN></P><P><SPAN>[St_To] Cross street representing the start or end of the centerline segment referenced in the [StName] field. Unlike in geocoding, this does not necessarily mean the start or end, in terms of digitized geometry directions. This field simply defines the boundaries of the segment. </SPAN></P><P><SPAN>[Neighborhood] The CONA neighborhood boundary that best represents the centerline centroid. If a centerline serves as a border to a neighborhood boundary, it will be associated with the neighboorhood that the majority of the project covers. </SPAN></P><P><SPAN>[PlanYear] The 4 digit planned year the work is going to occur. Will not store past years. </SPAN></P><P><SPAN>[WorkStatus] Describes the current status of the project. Statuses include "Future", "Completed", "On-Hold", "Not Planned". A project will only have a status of "Completed" for the duration of the fiscal year. After the fiscal year, the completed projects will be appended to the Road Maintenance History table for record, and the status will be changed back to "Not Planned".</SPAN></P><P><SPAN>[WorkType] The work to be performed on the road way. Values include "Mill and Overlay", "Slurry Seal", "Crack Seal", "Reconstruction"</SPAN></P><P><SPAN>[Responsibility] The entity responsible for the planned work. Values include "Public Service", "Engineering", "Private", "Other"</SPAN></P><P><SPAN>[Comment] Comment field to make production notes. </SPAN></P><P><SPAN>[Sq_Yrds] Square yardage of the associated road way segment. Managment can use this field to approximate the size of the project and associated cost. This field is calculated by multiplying the centerline shapelength field by the pavement width field and dividing by 9.</SPAN></P><P><SPAN>[CostEst_Slurry] Estimated cost to slurry seal the road way segment. Calculated by multiplying square yards by cost per yard for slurry seal maintenance. Most recent cost per square yard used is $2.58</SPAN></P><P><SPAN>[CostEst_Overlay Estimated cost to mill and overlay the road way segment. Calculated by multiplying square yards by cost per yard for mill and overlay maintenance. Most recent cost per square yard used is $12.25</SPAN></P><P><SPAN>[Width] Width of roadway in feet, taken from centerline. </SPAN></P><P><SPAN>[MaximoID] Maximo ID for the road way, taken from centerline. </SPAN></P></DIV></DIV></DIV> |
| licenseInfo:
|
|
| catalogPath:
|
|
| title:
|
TRANSPORTATION.RoadMaintenancePlan |
| type:
|
|
| url:
|
|
| tags:
|
["Overlay","Slurry","Transportation","Public Services","Road Maintenance"] |
| culture:
|
en-US |
| portalUrl:
|
|
| name:
|
|
| guid:
|
|
| minScale:
|
500000 |
| spatialReference:
|
|