Description: Attribute/Field NameTypeField DescriptionField ValueDescriptionFID*Object IDObjectIDShape *GeometryType of shape used THOROUGFATextType of Project (Enhanced or Proposed)Enhanced Facility ThoroughfareEnhanced SegmentProposed Facility ThroughfareProposed SegmentSTREETTYPETextFunctional ClassificationSTStreet (Includes Commercial Street (CS), Road (RD), Residential Street (RS))AVAvenueBVBoulevardHWHighwayPKWYParkwayCROSSSECTITextProposed Cross-section of the roadwayXX ###-##Functional Classification Width of Right-of-Way - Width of Pavement PRIORITYTextPrioritization of the Facility Short: 0-10 years0-10 yearsMedium: 10-20 years10-20 yearsLong: 20+ years20+ yearsN/ANot ApplicablePRIORITY_GTextPrioritization of the Facilities for the CIP Map 1Short Term (0-10 years)2Mid Term (10-20 years)3Long Term (20+ years)9Not Included in Prioritization (City Use)0Not Included in Prioritization (City Use)BikePlanTextBicycle Facility BBBuffered Bike LaneCTCycle TrackCT/BBCycle Track or Buffered Bike LaneCT/SPCycle Track or Shared Use PathSHSharrowsSPShared Use Path WSWide ShoulderNONENo Bike Facility N/ANot ApplicableSeg_NameTextName of Facility Segment used in Cost EstimatesA-#Avenue Facility Segment #B-#Boulevard Facility Segment #H-#Parkway Facility Segment #S-#Street Facility Segment #S-#-IZStreet Facility Segment # located in an Intensity ZonePA-#Proposed Avenue Facility Segment #PA-#-IZProposed Avenue Facility Segment # located in an Intensity ZonePB-#Proposed Boulevard Facility Segment #PH-#Proposed Parkway Facility Segment #PS-#Proposed Street Facility Segment #PS-#-IZProposed Street Facility Segment # located in an Intensity ZoneIH 35IH 35 Facility Segment *DOWNTOWNSegment located in Downtown *ROWTextRight of Way Classification for the facilityCOMMERCIALGREENFIELDRESIDENTIAL NONEShape_LengthDoubleLength of roadway segment (Feet)NumLanesShortNumber of Lanes of the Roadway SegmentRoadwayDivStringLength of roadway segment (Feet)Divided Roadway is divided UndividedRoadway is undivided For segments labeled Option_XXX-## in Attribute XS_HDR, the cross-section labeled is an optional cross-section and not designated. For polylines labeled DOWNTOWN in Attribute Seg_Name, the Cross-section classification is based on Option E-1 from the Downtown Analysis.*There are no Cost Estimate provided for IH 35 or DOWNTOWN at this time.GIS SDE Attributes:OBJECTID: System-generated unique identifier for each record within the feature class.CREATEDBY: Name of the person logged into the system that GIS automatically stamps as the original creator.CREATEDDATE: Date/time stamp from the moment the GIS record was created.MODIFIEDBY: Name of the person logged into the system that GIS automatically stamps as the feature is modified.MODIFIEDDATE: Date/time stamp from the last moment the GIS record was changed. SHAPE: System-generated geometry type of the feature.Shape.len: System-generated length of the feature.GlobalID: System-generated unique identifier for each record that is required in replicated geodatabases.
Copyright Text: HDR Engineering, City of San Marcos
Description: Attribute/Field NameTypeField DescriptionField ValueDescriptionFID*Object IDObjectIDShape *GeometryType of shape used THOROUGFATextType of Project (Enhanced or Proposed)Enhanced Facility ThoroughfareEnhanced SegmentProposed Facility ThroughfareProposed SegmentSTREETTYPETextFunctional ClassificationSTStreet (Includes Commercial Street (CS), Road (RD), Residential Street (RS))AVAvenueBVBoulevardHWHighwayPKWYParkwayCROSSSECTITextProposed Cross-section of the roadwayXX ###-##Functional Classification Width of Right-of-Way - Width of Pavement PRIORITYTextPrioritization of the Facility Short: 0-10 years0-10 yearsMedium: 10-20 years10-20 yearsLong: 20+ years20+ yearsN/ANot ApplicablePRIORITY_GTextPrioritization of the Facilities for the CIP Map 1Short Term (0-10 years)2Mid Term (10-20 years)3Long Term (20+ years)9Not Included in Prioritization (City Use)0Not Included in Prioritization (City Use)BikePlanTextBicycle Facility BBBuffered Bike LaneCTCycle TrackCT/BBCycle Track or Buffered Bike LaneCT/SPCycle Track or Shared Use PathSHSharrowsSPShared Use Path WSWide ShoulderNONENo Bike Facility N/ANot ApplicableSeg_NameTextName of Facility Segment used in Cost EstimatesA-#Avenue Facility Segment #B-#Boulevard Facility Segment #H-#Parkway Facility Segment #S-#Street Facility Segment #S-#-IZStreet Facility Segment # located in an Intensity ZonePA-#Proposed Avenue Facility Segment #PA-#-IZProposed Avenue Facility Segment # located in an Intensity ZonePB-#Proposed Boulevard Facility Segment #PH-#Proposed Parkway Facility Segment #PS-#Proposed Street Facility Segment #PS-#-IZProposed Street Facility Segment # located in an Intensity ZoneIH 35IH 35 Facility Segment *DOWNTOWNSegment located in Downtown *ROWTextRight of Way Classification for the facilityCOMMERCIALGREENFIELDRESIDENTIAL NONEShape_LengthDoubleLength of roadway segment (Feet)NumLanesShortNumber of Lanes of the Roadway SegmentRoadwayDivStringLength of roadway segment (Feet)Divided Roadway is divided UndividedRoadway is undivided For segments labeled Option_XXX-## in Attribute XS_HDR, the cross-section labeled is an optional cross-section and not designated. For polylines labeled DOWNTOWN in Attribute Seg_Name, the Cross-section classification is based on Option E-1 from the Downtown Analysis.*There are no Cost Estimate provided for IH 35 or DOWNTOWN at this time.GIS SDE Attributes:OBJECTID: System-generated unique identifier for each record within the feature class.CREATEDBY: Name of the person logged into the system that GIS automatically stamps as the original creator.CREATEDDATE: Date/time stamp from the moment the GIS record was created.MODIFIEDBY: Name of the person logged into the system that GIS automatically stamps as the feature is modified.MODIFIEDDATE: Date/time stamp from the last moment the GIS record was changed. SHAPE: System-generated geometry type of the feature.Shape.len: System-generated length of the feature.GlobalID: System-generated unique identifier for each record that is required in replicated geodatabases.
Copyright Text: HDR Engineering, City of San Marcos
Description: TypeField DescriptionField ValueDescriptionObject IDObjectIDGeometryType of shape used TextType of the Greenway/Trail Enhanced Facility GreenwayGreenway/Trail is enhancedProposed Facility Greenway Greenway/Trail is proposedTextClassification of Greenway/TrailUNDEVELOPEDA majority of the land along the Greenway/Trail has no built structuresNEEDS IMPROVEMENTAn existing path which should be upgraded as part of the Greenway/TrailPEDESTRIAN CROSSINGA segment of the Greenway/Trail is crossing a roadway, water feature, or requires a grade separated crossingNATURALGreenway/Trail exists of an unpaved natureBUILTA path of desired material and size currently existsUNKNOWNFurther information is neededTextOwnership of the land the Greenway/TrailPUBLIC/EXISTING EASEMENTMajority of the Greenway/Trail is on public land or an existing easementROWMajority of the Greenway/Trail is along an existing or proposed ROWTEXAS STATE UMajority of the Greenway/Trail is on Texas State University landUNKNOWNFurther information is neededPRIVATEMajority of the Greenway/Trail is on private propertyDoubleLength in miles, as calculated in GISLong IntegerLength in feet, as calculated in GISTextProposed Grade Separated Crossing along Greenway/TrailYesGrade-separated pedestrian crossing along Greenway/TrailNoNo grade-separated pedestrian crossings along Greenway/TrailN/ANot Applicable; new grade-separation not recommended along Existing TrailsLong IntegerUnique Project Number for Proposed Greenway/Trail projects starting at 1. (All Project_No that are 0 are existing facilities)TextMinimum Width of Greenway/Trail Project (feet)TextSurface Material usedCONCRETEConcrete in areas of higher use and flood-prone areasLIMESTONELimestone in areas of less use where a natural path is desiredN/AExisting Path, Materials only specified for Proposed pathsTextName of Street/Land the Greenway/Trail runs alongTextStarting Limit of the Greenway/TrailTextEnding Limit of the Greenway/TrailTextAt-Grade Pedestrian Crossings along Greenway/TrailYesAt-grade pedestrian crossing along Greenway/TrailNoneNo at-grade pedestrian crossings along Greenway/TrailTextPrioritizationSHORT0-10 YearsMEDIUM10-20 YearsLONG20+ YearsPDDProposed Short-Term Greenway on Planned Development or SubdivisionTextLength of segment (Feet)
Copyright Text: HDR Engineering, City of San Marcos